General contractors
Keying ready for your hardware submittal, plus construction cores swapped to permanent cores at handover.
Quote a project →For contractors and facility managers
Send us your door list. We design the keying schedule and master key system, then supply hardware keyed, labelled and ready to install.
Choose your role to see how we help.
Keying ready for your hardware submittal, plus construction cores swapped to permanent cores at handover.
Quote a project →White-label schedules and reliable pinning when keying is outside your capacity.
Partner pricing →Find out which key opens which door, fix lost-key problems and keep control with a yearly key register.
Book a key audit →Quick, fixed-price rekeys for tenant turnover and fit-outs, across one building or many.
Get a quote →Four steps from door list to keyed hardware.
Upload drawings, a hardware schedule or our free template. We reply with a fixed quote within 48 hours.
We plan the key levels, who opens what, and room to grow, then draft your keying schedule.
Review the schedule, request changes and sign off before anything is cut or pinned.
Cylinders and cores arrive pinned and labelled by door, with the final schedule and key chart.
Every project includes a clear, door-by-door keying schedule as PDF and spreadsheet. Your team can read it at a glance and your installer can work from it on site.
| Door | Room | Function | Key set | Opened by |
|---|---|---|---|---|
| 101 | Main entry | Storeroom | AA | GM, A |
| 102 | Office | Office | AA1 | GM, A, AA1 |
| 103 | IT room | Storeroom | X1 | GM, X1 |
| 201 | Office | Office | AB1 | GM, B, AB1 |
| 202 | Janitor | Storeroom | AB2 | GM, B, AB2 |
Start with the schedule. Add hardware and key control when you need them.
Door-by-door schedule, key hierarchy and bitting chart, delivered as PDF and spreadsheet.
Grand master, master and change-key levels planned for growth and easy to manage.
Cylinders, cores and locksets pinned to your schedule and labelled by door.
Temporary construction cores during the build, swapped for permanent cores at handover.
Survey of an existing building, a new schedule and a step-by-step rekey plan.
Yearly key register, issue log, change requests and priority reorders.
No surprises. The schedule fee is credited against any hardware order over $10,000.
$950 fixed
Up to 50 doors · 5 working days
Most popular
$2,400 fixed
51 to 200 doors · 10 working days
From $6,000
200+ doors or several buildings
| Service | Price |
|---|---|
| Keyed hardware supply | Quoted per order |
| Construction keying | $500 to $1,500 per project, plus cores |
| Rekey and audit survey | $1,200 per building |
| Key Control Plan | $990 per building per year ($790 from the 3rd building) |
We work alongside door hardware distributors, architects, installers, locksmiths and access control integrators. We are your keying team, not your competitor.
A keying schedule is a door-by-door plan showing which key opens each lock. It sets the key levels (grand master, master and change keys) so the right people have the right access.
A door list or hardware schedule, floor plans if you have them, your deadline, and who needs access to which areas. Our free template shows exactly what to include.
Schedule Starter takes 5 working days and Schedule Pro 10 working days from receipt of complete information. Keyed hardware usually ships 2 to 3 weeks after you approve the schedule.
We are brand-neutral and design around the hardware specified for your project. Tell us your preferred brand when you request a quote.
Yes. Our rekey and audit service surveys your current locks, designs a new schedule and plans the rekey in stages so the building stays secure.
You own your keying schedule. Bitting charts (the cut codes) are stored securely and released only to authorized contacts you name.
Schedules are 50% upfront and 50% on delivery. Hardware orders need a deposit. Approved business accounts can request net 30 terms.
Tell us about your building. We reply within 48 hours with a fixed price and timeline.
Prefer email?